Soft November daylight fills a traditional living room with white sash windows, oak floors and an oatmeal sofa accented by a powder-blue throw.

Webster Groves Made Its Occupancy Permit Universal. Here's Where It Lands in a Sale or a Lease.

You might list your Webster Groves house this winter, or a tenant in your duplex might give notice in January. Either way, when does the city walk through the property? The City Council adopted a universal occupancy permit program on November 3. As the city presented it before the vote, both cases get the same answer: the city inspects when the occupant changes.

That's the main shift in this month's code package. Webster Groves used to treat a home sale and a rental turnover as two separate inspection tracks on two separate calendars. Now one occupancy-permit standard covers every change of occupancy. The inspection used to be paperwork that ran alongside a deal. Now it's built into the deal's timeline.

What the council passed on November 3

The council approved several ordinances on third reading at its November 3 meeting. Citizen Portal's council coverage lists four of them:

  • Bill 9321 adopts updated technical codes.
  • Bill 9322 creates a universal occupancy permit and rental property registration program. It repeals and replaces Article 4 of Chapter 30 of the city code.
  • Bill 9325 removes specific fee amounts from the code so the council can set them by resolution.
  • Bill 9326 clarifies penalties.

The City's own notice says the technical update adopts the 2021 International Code Council family of building codes and the 2020 National Electrical Code. It also pulls in lithium-ion battery safety provisions from the 2027 International Fire Code.

Bill 9322 matters most for anyone selling or renting. Staff laid out its details at a Building Code Open House on October 22, before the final vote. The slide presentation from that session is the clearest public picture of how the program is meant to work. The specifics below come from it, as the city presented them that day.

The closing table, as the city laid it out

The open-house slide titled "New rules at the closing table" covers three changes for a sale.

  1. Disclosure happens twice. Sellers, buyers and agents give written notice of the occupancy-inspection and permit requirements at listing, then again at offer or contract.
  2. A sale can close before the inspection. That requires an escrow of at least $2,500.
  3. Violations run with the land. Open Notices of Violation pass to the new owner at closing, and "as-is" contract language can't waive them.

The slide sums up the city's position as "The City does not stand in the way of a sale, but parties must still follow the code."

The draft ordinance in the October 20 council agenda, reproduced on DeFlock The USA's agenda page, spells out the escrow in more detail. Under that draft, the inspection is supposed to happen before closing. A cash escrow with the closing agent is allowed only with the Building Commissioner's prior approval. The amount is at least $2,500, or more if the Commissioner sets a higher figure based on known violations. After closing, buyer and seller share responsibility for completing the inspection within 14 calendar days of title transfer. The escrow is released when the inspection is done on time. It goes to the City if the deadline passes because reasonable access wasn't provided. The escrow also doesn't permit anyone to move in. Occupancy waits until a Permit to Occupy is issued.

That last point affects the deal most. The escrow lets the closing date stay put. A buyer who plans to move in that weekend still has to wait for the inspection and the permit.

The "as-is" point changes how a fixer-upper sale gets priced. A seller can't use contract language to pass known code problems to a buyer without the city's notice following them. Any open violation goes to the new owner along with the deed, so it ends up as part of the price conversation.

Old wiring is a disclosure, not an automatic stop

The city said its local amendments were written with Webster Groves' historic homes and older housing in mind. The wiring rules show this most clearly.

The open-house deck sorts wiring by the home's age:

  • Pre-1960 homes with knob-and-tube wiring: If the owner knows it's there, it's disclosed on the occupancy application. The city withholds a Conditional Occupancy Permit only if exposed wiring shows degradation, fraying or unsafe splicing.
  • Homes built 1965 to 1978 with aluminum branch-circuit wiring: It's disclosed the same way. It disqualifies a home only if visible wiring or connections show signs of overheating, arcing or loose terminations.

The slide sums it up as "Presence alone is not disqualifying. Visible harm is." For a 1920s house in Webster Groves with original wiring in the walls, the key question at inspection is what the exposed runs in the basement or attic look like.

A related rule affects pre-listing fixes. Under the proposal, owner-occupants of detached single-family homes can still pull permits and do some of their own work. Several jobs are off-limits, though:

  • electrical service work
  • solar panels
  • water heaters
  • furnaces and A/C
  • water service and sewer laterals
  • backflow devices
  • fire suppression
  • any work on knob-and-tube or aluminum wiring

Owner-performed work is also capped at one story and 400 square feet, with basement renovations excepted, and must be finished within a year. If you plan to touch old wiring before you list, that work goes to a contractor.

For landlords, the three-year rotation ends

Small-building owners will notice the biggest change. Under the old system, the city inspected one-third of a building's rental units each year. Each unit got a full inspection every three years, and turnovers in between didn't trigger one. Under the new program, every unit is inspected at every change of tenancy. A continuing tenancy is left alone unless there's a specific complaint.

Here's how the open-house deck compared the old rules with the proposed ones:

Item Before As proposed
Inspection trigger One-third of units per year on rotation Every unit at every change of tenancy
Individual owner info Operator's name only Legal name, physical address with no P.O. boxes, phone, email, date of birth, photo ID
Tenant roster None listed Annual whole-property roster with adult tenant names, headcount and move-in dates
Filing calendar July 1 to June 30 license year, renewals Jan. 1 to Feb. 14 One annual deadline of Nov. 1, with a one-time grace period through Feb. 14 of the following year for current registrants
Local agent for out-of-town owners St. Louis City or St. Louis County Adds St. Charles, Jefferson and Franklin counties

For LLCs, corporations and trusts, the proposal calls for names, addresses and phone numbers for every principal, officer, member, partner, trustee or beneficiary. Date of birth and photo ID are required for at least one person in control.

The trigger change is the one that affects the numbers. Under the rotation, inspections came on a fixed schedule regardless of tenant behavior. Under a turnover-based system, the units that turn over most get inspected most. For an investor comparing a Webster Groves two-family with one in a neighboring city, the gap between leases now has to cover a city inspection. A unit with yearly lease turnover sees the inspector every year, not every third year.

Out-of-town owners get more flexibility. Before, they had to name a local agent in the City or County of St. Louis. Under the proposal, they can also pick someone in St. Charles, Jefferson or Franklin County.

The contractor you hire is under new rules too

Sellers fixing things before listing, and landlords turning units, depend on contractors. The city's proposal tightens contractor registration in ways that can affect a job's timeline.

General contractors and structural builders currently don't have to show any credential. Under the proposal, they qualify through one of these:

  • a City-approved exam
  • ICC certification
  • a NASCLA-accredited exam
  • a specified relevant bachelor's degree
  • an equivalent government-issued license

Specialty trades still need an existing St. Louis City or County trade license. Liability insurance minimums rise from $500,000 per occurrence and $1 million aggregate to $1 million and $2 million. Insurance, now required only of specialty trades, would extend to general contractors.

Each contractor also has to name a Responsible Managing Individual, who is jointly and severally liable with the company. If that person leaves, the company has five business days to report it and 15 days to name a successor. Otherwise its registration suspends automatically and its active permits get stop-work orders. That rule is aimed at contractors, but it can stall the homeowner's job too.

The city can also withhold permits from contractors with unresolved code violations, open stop-work orders, pending enforcement actions, or unresolved court judgments. Owners can file a written complaint to trigger a City investigation.

The fees come later

The dollar amounts haven't been set yet. The open-house deck describes the old fees as scattered across several places:

  • a flat $75 contractor registration fee written into the code
  • occupancy inspection fees tied to "Ordinance 8769, as amended"
  • rental fees on a schedule posted in the Director's office

The proposal moves all Planning & Development fees into one schedule that the council sets by resolution. The slide states, "Dollar amounts are not yet drafted. The schedule will return to Council as its own item." Bill 9325, adopted November 3, is what lets the council set fees that way.

So when you budget for a sale or a turnover, check the current inspection fee with the city. The Housing Inspections page is the place to start, and the planning staff take questions at [email protected].

Quick answers

Does a tenant who renews a lease trigger an inspection? Not under the program as presented. A continuing tenancy is left alone unless there's a specific complaint.

Can a sale close if the inspection isn't done? The October draft allows it with the Building Commissioner's prior approval and a cash escrow of at least $2,500. The inspection is due within 14 calendar days after title transfer, and no one moves in until a Permit to Occupy is issued.

Does knob-and-tube wiring automatically fail a home? As proposed, no. Known knob-and-tube wiring is disclosed. A Conditional Occupancy Permit is withheld only if exposed wiring shows degradation, fraying or unsafe splicing.

When is the next rental registration due? The proposal sets one annual deadline of Nov. 1, with a one-time grace period through Feb. 14 of the following year for current registrants. Confirm your building's date with the city.

This post is general information about a city program, not legal, tax or financial advice. Confirm how the adopted ordinance applies to your property with the City of Webster Groves and your own attorney or advisor.

If a Webster Groves sale or lease turnover is on your calendar for the next few months, DeMaggio Partners can help you plan around the occupancy inspection, from timing your listing disclosures to lining up registered contractors before the inspector arrives. Let's talk about your next move. Book a free consultation or get your home valuation.

WORK WITH BETHANY

She offers the highest level of expertise, service, and integrity. Bethany is the leading real estate agent in Saint Louis and has helped hundreds of buyers find their dream homes in Missouri. Contact Bethany today to discuss all your real estate needs!

Follow Us on Instagram